Short term views
These pictures catch some of the views that in a few short months will no longer be there when the building is finished. During the early part of January the West Camel Road has been reduced to one lane and traffic lights used for safety. This is allowing for the sewage pipe to be connected to the one that goes through the new housing. Coming up soon the mains electric and water will be connected along with the gas for heating and hot water boiler.
<gdiv></gdiv>