Concrete Day
The debate on the day was would it be 170 or 180 cubic meters of concrete to cover the whole floor area of the school? It was amazing to watch the team at work from the concrete pump to the smoothing it was physical and at time subtle. Such an exciting day under the new roof made even more atmospheric by the heavy rain showers and thunder rumbling in the distance.
<gdiv></gdiv>