Final fixtures and fittings

Sink Icon 2

The heating is on to help lay the floor; the lights are glowing so the building team can do all the finishing touches. From hooks for the children’s bags to hot water systems to make drinks.

Corridor litHooks and bags 2Foundartion stage Kitchen finished 2

 

 

 

 

 

 

 

 

 

 

Link to previous blog post

Hall floor down 2

Library floor

Office lightsHot water on tapToilet sinks 2